
Vector Mapping Capabilities and Limitations Published by the Manufacturer

ASTM D7877 identifies this low voltage method as Electric Field Vector Mapping. Buckleys International, manufacturer of the Wet Roof Pro2, refers to the method as voltage gradient mapping or vector mapping. Some testing agencies and industry sources use the abbreviation EFVM. For clarity, this page uses Vector Mapping throughout.
Can Vector Mapping test EPDM?
Buckleys says no.
Buckleys states that EPDM cannot be tested because it contains carbon, which makes it conductive. Buckleys also describes the Wet Roof Pro2 as suitable for nonconductive membranes.
Can Vector Mapping test semi conductive membranes?
Capability is not established.
Buckleys publishes the Wet Roof Pro2 for nonconductive roof surfaces and membranes. The public Buckleys documentation reviewed does not establish a general capability for semi conductive membranes.
ASTM D8231, by comparison, specifically addresses certain moderately conductive membranes for its scanning method.
Can Vector Mapping test vertical surfaces?
Published documentation does not establish Vector Mapping as a vertical surface method.
In a technical presentation, Buckleys describes Voltage Field Mapping as applicable to substantially flat surfaces, including decks and roofs, and shallow slopes. The presentation also lists a substantially level surface as a constraint.


Can Vector Mapping locate leaks through overburden?
Effective leak location through overburden is not supported.
Buckleys states that Voltage Field Mapping may be able to detect the presence of leaks but cannot effectively locate them through overburden.
The same presentation recommends confirming watertight integrity before drainage layers, deck systems, or green roof assemblies are installed. ASTM D8231 likewise requires testing before overburden is installed for the scanning method.
Why manufacturer documentation matters
ASTM D7877 directs users to the equipment manufacturer instructions for proper operation and use.
​
When a Vector Mapping capability claim goes beyond the manufacturer published documentation, the claim should be independently substantiated before it is written into a roofing or waterproofing specification.